Concord,
NH
Department of Motor
Vehicles
|
A new building requiring a
three phase electric service. Our design included
site lighting and controls, general interior lighting and controls and
exit and emergency lighting. Emergency lighting fixtures were powered
by a central UPS (Uninterpretable Power Supply). The distribution
system
provided power for general receptacles, HVAC equipment, fire alarm
systems,security and Video Systems.
|