Portsmouth,
NH
National Sea Products
|
This report and electrical
system survey provided the owner with a description of the primary and
secondary services, transformers and switchboards. The report also
described the utility rate structure and made recommendation to reapply
loads in order to reduce costs to suit the rate structure. The report
addressed power factor and the use of capacitors at various locations
in the power distribution system. The electrical distribution system
design was reviewed and the system deficiencies were listed and
associated costs for corrections were provided. A load study was
provided with an explanation of how to reduce operating costs and
indicating additional cost savings steps that could be implemented to
realize additional savings.
|