Designing
                   Your Electrical Requirements
                                                            with Effective Solutions
homeservicesabout uscontact us

Consulting Electrical Engineers

  Ackroyd Engineering Logo                                                                                       









                                                                                                         PROJECTS
BACK<                       INDUSTRIAL                        >NEXT
Tyngsbourough, MA                   Beacon Power Corporation
beacon power corporation
This project was adaptive reuse of an existing building in which the existing electric service and distribution system was to be replaced with a new service and distribution system sized to meet the needs of the new owner. A  three phase electric service was provided. The service consisted of a new riser pole set in place by the electric utility company as part of the primary high voltage line extension. Primary underground raceways from the riser pole to the pad mount transformer and were concrete encased. Underground  secondary service raceways terminate in a new main switchboard in the main electric room. The multi section switchboard has feeds that serve the elevator, chiller, HVAC equipment and panelboards throughout the building.


                                                                               

© 2012 ¤ Ackroyd Engineering,LLC  ¤ Manchester  ¤  New Hampshire ¤ Phone: 603-625-1344 ¤ Fax: 603-625-9144