This project was adaptive
reuse of an existing building in which the existing electric service
and distribution system was to be replaced with a new service and
distribution system sized to meet the needs of the new owner. A
three phase electric service was provided. The
service consisted of a new riser pole set in place by the electric
utility company as part of the primary high voltage line extension.
Primary underground raceways from the riser pole to the pad mount
transformer and were concrete encased. Underground secondary
service raceways terminate in a new main
switchboard in the main electric room. The multi section switchboard
has feeds that serve the elevator, chiller, HVAC equipment and
panelboards throughout the building.
|